On February 3, 2021, the Second Chamber of the Mexican Supreme Court decided Constitutional Action 89/2020, filed by the Federal Antitrust Commission (Comisión Federal de Competencia Económica, "COFECE"), against the Ministry of Energy's (Secretaría de Energía, "SENER") Policy for the Reliability, Safety, Continuity and Quality of the National Electric System (the "Policy"). The Policy had created concern regarding private sector participation in Mexico's electric industry.1 The antitrust watchdog claimed that SENER overstepped its authority and undermined competition in the electric industry by unduly strengthening the government-owned Electricity Federal Commission ("CFE").

The Decision

In a 4-1 decision (with the objection of Justice Yasmín Esquivel, who was appointed by President López Obrador, dissenting), the Second Chamber of the Court declared invalid several sections of the Policy. Nevertheless, the Second Chamber upheld some sections of the Policy, determining that the new regulations did not differ from the rules provided for in the existing Network Code (Código de Red). In a few other instances, the Second Chamber did not analyze the constitutional arguments advanced by COFECE against the Policy, considering those irrelevant for the matter at hand.

A summary of the key elements of the Court's decision follows:

  • CFE is integral to the State's endeavor to develop the National Electric System (Sistema Eléctrico Nacional, "SEN"). The Court upheld Section 3.8.5. of the Policy, which provides that CFE may actively participate in the design of the expansion and modernization of the national distribution and general distribution networks.
  • The Court declared that drafting Reliability Criteria and Guidelines is beyond the scope of CFE´s permitted activities.
  • CFE may not propose to SENER strategic infrastructure projects to improve SEN.
  • The Court also stated that Section 5.7 of the Policy is invalid. Section 5.7 provided that, for the interconnection of private projects, an interconnection feasibility opinion issued by the National Center of Energy Control (Centro Nacional de Control de Energía, "CENACE") could be required.
  • It is discriminatory that provisions of the Policy require CENACE to consider in its interconnection studies: (a) the local demand and consumption of electricity; (b) the state of congestion in the interconnection network; (c) the availability of solar and wind resources; (d) how the interconnection would impact the reliability of the electric supply; and (e) "distance" between projects.
  • The ability of SENER to prioritize certain projects and grant them a preferential status for interconnection is invalid.
  • The provision of the Policy prioritizing "security" over cost in the dispatch of electricity is invalid.
  • The rule setting forth that access to the grid may be denied to a renewable generation project that requests interconnection to a congested point is unconstitutional.

The Court did not address the new early termination clauses advanced by the Policy. These clauses require that "new and amended" generation permits and the corresponding interconnection agreements include provisions regarding their early termination in the event that interconnection and commercial operation are not achieved within the specified timeframe. This requirement could represent a high risk for projects under construction (especially those that have already suffered delays due to COVID-19).

Other Proceedings

Many power generation projects across the country have also filed amparo proceedings against the Policy and have obtained injunctive reliefs against the Policy from lower courts.

Footnote

1 For more information please see: https://www.mayerbrown.com/en/perspectives-events/publications/2020/05/mexican-ministry-of-energys-new-policy-impact-on-wind-and-solar-generation-projects

Visit us at mayerbrown.com

Mayer Brown is a global legal services provider comprising legal practices that are separate entities (the "Mayer Brown Practices"). The Mayer Brown Practices are: Mayer Brown LLP and Mayer Brown Europe – Brussels LLP, both limited liability partnerships established in Illinois USA; Mayer Brown International LLP, a limited liability partnership incorporated in England and Wales (authorized and regulated by the Solicitors Regulation Authority and registered in England and Wales number OC 303359); Mayer Brown, a SELAS established in France; Mayer Brown JSM, a Hong Kong partnership and its associated entities in Asia; and Tauil & Chequer Advogados, a Brazilian law partnership with which Mayer Brown is associated. "Mayer Brown" and the Mayer Brown logo are the trademarks of the Mayer Brown Practices in their respective jurisdictions.

© Copyright 2020. The Mayer Brown Practices. All rights reserved.

This Mayer Brown article provides information and comments on legal issues and developments of interest. The foregoing is not a comprehensive treatment of the subject matter covered and is not intended to provide legal advice. Readers should seek specific legal advice before taking any action with respect to the matters discussed herein.